GeoPave and Mirafi HP270 at Brewery Parking Lot
To meet floodplain challenges and COH standards, a Houston Brewery installed GeoPave® pavers with Mirafi HP270 fabric, creating a cost-effective, durable parking solution that performed well in storm events.
Challenge
Because the brewery experiences a significant traffic flow, we aimed to implement a system that could withstand this traffic while simultaneously aligning with City of Houston detention standards, all while featuring the most aesthetically pleasing pavers available.
Solution
Collaborating with Ferguson, the contractor successfully introduced GeoPave (permeable paver) with Mirafi HP270 (structural fabric), a solution that met all the required criteria. Through on-site soil testing (provided by Ferguson), the contractor effectively implemented the use of the GeoPave Pavers and a drainable, compactable aggregate over Mirafi HP270. After several storm events, the system demonstrated outstanding performance. The contractor even managed to install handicap and parking spots via the GeoPave Snap Delineators, aligning with the owner’s visual specifications.
Site Conditions
Given that this site is situated within a floodplain area, our objective was to establish a system that would remain resilient in the face of potential flooding or intense rain events.
Constraints
The initial project pavement design involved a substantial layer of screened rock, which proved to be cost-prohibitive. Consequently, we had to explore alternatives, such as GeoPave Pavers, to find a more economical solution.
Optimization Highlights
This approach eliminated the necessity for subgrade stabilization. It enabled a reduction in the thickness of aggregate required in the base course section, all while providing a solution to address past and future moisture-related issues in the lot.
View Similiar Case Studies
In order to revitalize and meet stormwater codes, the abandoned parking area at the Shoppes at Fashion Square in Orlando, FL, required updates. With a permeable paving system and machine technology, we helped the client achieve their goals, save $1 million, and complete the project in just 10 days.
With solar panels in place and operational, an immediate and effective erosion control solution was imperative. Especially considering the panels were positioned next to channels, drip lines, and spillways.
After failed attempts to stabilize the earth at the Mt. Jackson Solar Farm, they required an immediate, cost-effective erosion control solution. Ferguson Waterworks was brought on board to address their ongoing concerns.