Winter Island Park in Salem, MA

Examine how a space-saving biofiltration system reduced parking lot ponding, slowed discharge rate and increased water quality for important wildlife at a historical site.

Results of biofiltration system that reduced parking lot ponding in Salem, MA - more case studies from Ferguson Waterworks
Customer:
Winter Island Park
Location:
Salem, Massachusetts

Download Case Study

Initial Concern

The client contacted us for assistance in finding a solution for a stormwater concern at a historical recreation site. Untreated stormwater was flowing off of approximately 2.5 acres of impervious buildings and parking lots, emptying directly into Salem Harbor. The runoff led to decreased sea water quality due to sediment, bacteria, metals, oils and grease. This affected important shellfish, water fowl habitats and fisheries. Not to mention, surrounding parking lots were experiencing severe ponding.

Goal

The client desired a cost-effective system that would filter stormwater, increasing water quality and could fit into the limited footprint available.

Installation & Solution

After careful consideration, it was decided that FocalPoint Biofiltration System would be the best solution to treat the polluted runoff and slow the rate of discharge into the harbor. It was chosen because it combines next generation biofiltration media with a high performance underdrain to deliver all the advantages of a traditional bioretention system, in a footprint up to 90% smaller. This was key for the project because of the limited footprint available. A domed overflow riser with a filter insert was added to the installation to collect any floatables and mulch. Overall, the installation took less than a day.

Result

FocalPoint Biofiltration System reduced parking lot water ponding and bank erosion. It also significantly removed a number of pollutants. There have been several major storms since the system was installed, and FocalPoint has performed exactly as designed. The client was elated that the system has helped improve the harbor’s water quality while maintaining the integrity of the historical site.

View Similiar Case Studies


Case studies - results from installing permeable paving & machine technology to get an abandoned site up to stormwater code

Explore how we used permeable paving and machine technology to help bring an abandoned site up to stormwater code prior to development—saving the client almost $1 million.

Case studies - Contractors mitigated runoff at a solar farm in Roanoke Rapids, NC

See how contractors mitigated erosion and sediment runoff at a solar farm in Roanoke Rapids, NC.

Products: ShearForce
Solar Farm Mount Jackson

Learn how Ferguson Waterworks addressed some concerning erosion problems on a solar farm in Mt. Jackson, VA.

Products: ShearForce

Case Studies

From solving challenging application issues to severe weather response, there is no better partner than Ferguson Waterworks. Let our past performance speak for itself.

ferguson industrial case studies hero

Start Your Project Today