Winter Island Park in Salem, MA
Examine how a space-saving biofiltration system reduced parking lot ponding, slowed discharge rate and increased water quality for important wildlife at a historical site.
Download Case Study
Initial Concern
The client contacted us for assistance in finding a solution for a stormwater concern at a historical recreation site. Untreated stormwater was flowing off of approximately 2.5 acres of impervious buildings and parking lots, emptying directly into Salem Harbor. The runoff led to decreased sea water quality due to sediment, bacteria, metals, oils and grease. This affected important shellfish, water fowl habitats and fisheries. Not to mention, surrounding parking lots were experiencing severe ponding.
Goal
The client desired a cost-effective system that would filter stormwater, increasing water quality and could fit into the limited footprint available.
Installation & Solution
After careful consideration, it was decided that FocalPoint Biofiltration System would be the best solution to treat the polluted runoff and slow the rate of discharge into the harbor. It was chosen because it combines next generation biofiltration media with a high performance underdrain to deliver all the advantages of a traditional bioretention system, in a footprint up to 90% smaller. This was key for the project because of the limited footprint available. A domed overflow riser with a filter insert was added to the installation to collect any floatables and mulch. Overall, the installation took less than a day.
Result
FocalPoint Biofiltration System reduced parking lot water ponding and bank erosion. It also significantly removed a number of pollutants. There have been several major storms since the system was installed, and FocalPoint has performed exactly as designed. The client was elated that the system has helped improve the harbor’s water quality while maintaining the integrity of the historical site.
View Similiar Case Studies
Explore how we used permeable paving and machine technology to help bring an abandoned site up to stormwater code prior to development—saving the client almost $1 million.
See how contractors mitigated erosion and sediment runoff at a solar farm in Roanoke Rapids, NC.
Learn how Ferguson Waterworks addressed some concerning erosion problems on a solar farm in Mt. Jackson, VA.